by BRADGROTT » 20 Jul 2005 3:17
I sent my engine to the builder with the note that the car would be down for several months while doing the bodywork. He primed the engine , basicly ran it quickly with oil in it, to coat the insides. taped off the exhuast ports and intake manifold, put a plasitc bag on it and said it would be fine till bodywork done. Being in the desert of las vegas 2% humidity today with an outside temp of 118 degrees, may be different in your area. I think i would leave it till ready if i had to do it over.